trezor.io
Rate this file (Rating : 5 / 5 with 1 votes)
space shuttle atlantis
trezor.io

Space Shuttle Atlantis

9 - 2 August 1991 - STS-43 - 39A - KSC - 8 days, 21 hours, 21 minutes, 25 seconds - 3,700,400 miles (5,955,200 km) - Deployed Tracking and Data Relay Satellite-5 (TDRS-5 or TDRS-E).
10 - 24 November 1991 - STS-44 - 39A - Edwards AFB - 6 days, 22 hours, 50 minutes, 44 seconds - 2,890,067 miles (4,651,112 km) - Mission dedicated to Department of Defense. The unclassified payload included a Defense Support Program (DSP) satellite deployed on flight day one.
11 - 24 March 1992 - STS-45 - 39A - KSC - 8 days, 22 hours, 9 minutes 28 seconds - 3,274,946 miles (5,270,515 km) - Carried first Atmospheric Laboratory for Applications and Science (ATLAS-1). ATLAS-1 equipped with 12 instruments conducted studies in atmospheric chemistry, solar radiation, space plasma physics and ultraviolet astronomy.
12 - 31 July 1992 - STS-46 - 39A - KSC - 7 days, 23 hours, 15 minutes, 3 seconds - 3,321,007 miles (5,344,643 km) - Deployed the Tethered Satellite System (TSS), a joint NASA/Italian Space Agency experiment. The satellite only reached a maximum of 860 feet (260 m) instead of 12.5 miles (20.1 km), because of a jammed tether line. The European Retrievable Carrier (EURECA) satellite was deployed for the European Space Agency (ESA).

File information
Filename:617344.jpg
Album name:Earth & Universe
Rating (1 votes):55555
Keywords:#space #shuttle #atlantis
Filesize:68 KiB
Date added:Apr 04, 2014
Dimensions:700 x 464 pixels
Displayed:105 times
URL:displayimage.php?pid=617344
Favorites:Add to Favorites