|
Marina Bay Sands, Singapore
|
When complete, the resort will feature a 2,560-room hotel, 120,000 sq-meter convention-exhibition center, The Shoppes mall, six restaurants, an Art & Science museum, two Sands Theatres, two floating pavilions, a casino with 500 tables and 1,600 slot machines. The complex is topped by a 340m-long SkyPark with a capacity of 3,900 people and a a 150m swimming pool, set on top of the world's largest public cantilevered platform, which overhangs the north tower by 67m. The 51-acre resort was designed by Moshe Safdie.
Originally set to open in 2009, Las Vegas Sands faced delays caused by escalating costs of material and labour shortages from the onset. The severe global financial crisis also pressured the company to delay its projects elsewhere in order to complete the Singapore IR. Although Marina Bay Sands has been compared on scale and development costs to MGM's CityCenter, the latter is a mixed-use development, with condominium properties - comprising three of the seven main structures, being sold off. The resort was officially opened with a 2-day celebration on 23 June 2010 at 3.18 pm, after a partial opening earlier in April. The museum, theatres and floating pavilions are still being built and are expected to be fully completed by December 2010.
|
|