|
LCS, Littoral Combat Ship Vessel
|
The first littoral combat ship, USS Freedom, was commissioned on 8 November 2008 in Veteran's Park, Milwaukee, Wisconsin. The second ship and first of the trimaran design, the USS Independence, was commissioned on 16 January 2010, in Mobile, Alabama. The third littoral combat ship, USS Fort Worth, of similar design to the USS Freedom, was commissioned 22 September 2012 in Galveston, Texas.
In 2012, CNO Jonathan W. Greenert said some of the LCS would be deployed to Africa in place of destroyers and cruisers. Then in 2013, the LCS requirement was cut from 55 to 52 ships, because U.S. Africa Command reduced the presence requirement.
|
|